36 Bonnie Drive

2021

Cracks in the Driveways
Various Fissures, Cracks and gaps in the concrete and asphalt driveway.

Yardwork
Removal of rocks, unwanted vegetation, cleanup and planting continues.

Basement Painting
Finishing up on painting the basement walls and floor.

Basement Ceiling Joists
Screwing ceiling joists into place. They should be 4 ft apart to meet code. The builder interpreted the regulation as 8 ft. Putting these up is work!

Blinds Installing Venetian Blinds on various windows for privacy, sun filtering.